▲ SHEET INDEX
FIELD 01 / STRUCTURAL STEEL · TILT-WALL · METAL DECKING

Steel erection from a different view.

J & R Steel Welding erects structural steel, sets tilt-wall and precast panels, and installs metal deck for general contractors across Texas. Every project below is shown as we left it — drone flyovers, phase by phase, so you can survey the work yourself.

AERIAL RECORD — ASCALON SITE · TX · JUN 2026
FIG 01-A — COVER PLATE · MOST RECENT FLYOVER ON FILE SOURCE: J&R FIELD DOCUMENTATION
FULL RECORD SET — 12 PROJECTS · 18 FLYOVERS · 30 RECORD PLATES
0 +YRS
Field experience
0
Projects on record
0
Drone flyovers
0
Documented site visits
FIELD 03 / PRIOR RECORD SETS
  • Temple ISD Athletic FacilityTemple, TX
  • Woodsboro Elementary SchoolWoodsboro, TX
  • Saint Austin Rehabilitation CenterTexas
  • UT Austin Boiler ReplacementAustin, TX
SHT 02 — NEW CANEY OPERATIONS BUILDING
New Caney Operations Building Texas Last capture: Oct 2026 — SHT 02 / 15
SHT 02 / ACTIVE RECORD · OFFICE

New Caney Operations Building

PROVISIONAL

P.1 — CAPTURED OCT 2026 P.1

STATION LINE — SITE VISITS ON FILE

FIG 02-A — AERIAL PLATE · P.1 · OCT 2026 · FOOTAGE TO FOLLOW
SHT 03 — UT BOILER REPLACEMENT
UT Boiler Replacement Texas Last capture: Oct 2026 — SHT 03 / 15
SHT 03 / ACTIVE RECORD · INDUSTRIAL

UT Boiler Replacement

PROVISIONAL

P.1 — CAPTURED OCT 2026 P.1

STATION LINE — SITE VISITS ON FILE

FIG 03-A — AERIAL PLATE · P.1 · OCT 2026 · FOOTAGE TO FOLLOW
SHT 04 — GOLIAD MIDDLE/HIGH
Goliad Middle/High Texas Last capture: Oct 2026 1 flyover · 2 plates SHT 04 / 15
SHT 04 / ACTIVE RECORD · EDUCATION

Goliad Middle/High

PROVISIONAL

P.1 — CAPTURED OCT 2026 · 1 FLYOVER · 2 PLATES P.1

STATION LINE — SITE VISITS ON FILE

FIG 04-A — AERIAL PLATE · OCT 2026
Aerial still of the Goliad Middle/High site, October 2026 — view 1 of 2
FIG 04-B — AERIAL STILL 1/2
Aerial still of the Goliad Middle/High site, October 2026 — view 2 of 2
FIG 04-C — AERIAL STILL 2/2
SHT 05 — CYFAIR FIRESTATION
CyFair Firestation Texas Last capture: Oct 2026 — SHT 05 / 15
SHT 05 / ACTIVE RECORD · MUNICIPAL / CIVIC

CyFair Firestation

PROVISIONAL

P.1 — CAPTURED OCT 2026 P.1

STATION LINE — SITE VISITS ON FILE

FIG 05-A — AERIAL PLATE · P.1 · OCT 2026 · FOOTAGE TO FOLLOW
SHT 06 — VIDOR PINE ELEMENTARY
Vidor Pine Elementary Texas Last capture: Oct 2026 — SHT 06 / 15
SHT 06 / ACTIVE RECORD · EDUCATION

Vidor Pine Elementary

22k sqft addition to Vidor Pine Elementary. PROVISIONAL

P.1 — CAPTURED OCT 2026 P.1

STATION LINE — SITE VISITS ON FILE

FIG 06-A — AERIAL PLATE · P.1 · OCT 2026 · FOOTAGE TO FOLLOW
SHT 07 — COUTLER BUILDINGS (1&2)
Coutler Buildings (1&2) Texas Captures: Jul · Jul 2026 4 plates SHT 07 / 15
SHT 07 / ACTIVE RECORD

Coutler Buildings (1&2)

2 PEMB Building PROVISIONAL

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

Aerial still of the Coutler Buildings (1&2) site, July 2026 — view 1 of 2
FIG 07-A — AERIAL STILL 1/2
Aerial still of the Coutler Buildings (1&2) site, July 2026 — view 2 of 2
FIG 07-B — AERIAL STILL 2/2
SHT 08 — ALAMO COLLEGE (BLACK BOX)
Alamo College (Black Box) San Antonio, Texas Captures: Jul · Oct 2026 2 flyovers · 3 plates SHT 08 / 15
SHT 08 / ACTIVE RECORD · EDUCATION

Alamo College (Black Box)

This project is a beautiful addition to expand Alamo College.

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

FIG 08-A — AERIAL PLATE · P.1 · FLYOVER 1 · JUL 2026
FIG 08-B — AERIAL PLATE · P.1 · FLYOVER 2 · JUL 2026
SHT 09 — ASCALON
Ascalon Texas Captures: Jun · Jul 2026 3 flyovers · 5 plates SHT 09 / 15
SHT 09 / ACTIVE RECORD · NEWEST ON FILE

Ascalon

The most recent record in the set. J&R's scope covers the structural steel package — primary framing, welding, and miscellaneous details. The June 2026 flyovers below survey the erected structure and the working site. PROVISIONAL

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

FIG 09-A — AERIAL PLATE · P.2 · FLYOVER 1 · JUN 2026
FIG 09-B — AERIAL PLATE · P.2 · FLYOVER 2 · JUN 2026
Aerial still of the Ascalon site, June 2026 — view 1 of 5
FIG 09-C — AERIAL STILL 1/5
Aerial still of the Ascalon site, June 2026 — view 2 of 5
FIG 09-D — AERIAL STILL 2/5
Aerial still of the Ascalon site, June 2026 — view 3 of 5
FIG 09-E — AERIAL STILL 3/5
Aerial still of the Ascalon site, June 2026 — view 4 of 5
FIG 09-F — AERIAL STILL 4/5
Aerial still of the Ascalon site, June 2026 — view 5 of 5
FIG 09-G — AERIAL STILL 5/5
SHT 10 — CLS CLINIC
CLS Clinic Pearland, TX Captures: Jan · Mar 2026 3 flyovers · 7 plates SHT 10 / 15
SHT 10 / TWO-PHASE RECORD · PEARLAND · HEALTHCARE

CLS Clinic

Steel package for the CLS Clinic in Pearland, documented across two site visits eight weeks apart. Between the January and March flyovers the structure advances from early erection to a framed building — drag the comparative plate below to survey the progress yourself. PROVISIONAL

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

FIG 10-A — AERIAL PLATE · P.1 · JAN 2026
Aerial still of the CLS Clinic site, January 2026 — view 1 of 3
FIG 10-B — AERIAL STILL 1/3
Aerial still of the CLS Clinic site, January 2026 — view 2 of 3
FIG 10-C — AERIAL STILL 2/3
Aerial still of the CLS Clinic site, January 2026 — view 3 of 3
FIG 10-D — AERIAL STILL 3/3
CLS Clinic site in March 2026
CLS Clinic site in January 2026
P.1 — JAN 2026 P.2 — MAR 2026
FIG 10-K — COMPARATIVE PLATE · DRAG TO SURVEY · JAN ⟷ MAR 2026
SHT 11 — INNER PEACE
Inner Peace Georgetown, TX Captures: Dec · Jan 2026 2 flyovers · 5 plates SHT 11 / 15
SHT 11 / TWO-PHASE RECORD · GEORGETOWN

Inner Peace

Steel erection in Georgetown documented across two winter site visits. The December flyover records the frame going up; the January follow-up captures the advanced structure five weeks on. PROVISIONAL

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

Aerial still of the Inner Peace site, winter 2025–26 — view 1 of 5
FIG 11-A — AERIAL STILL 1/5
Aerial still of the Inner Peace site, winter 2025–26 — view 2 of 5
FIG 11-B — AERIAL STILL 2/5
Aerial still of the Inner Peace site, winter 2025–26 — view 3 of 5
FIG 11-C — AERIAL STILL 3/5
Aerial still of the Inner Peace site, winter 2025–26 — view 4 of 5
FIG 11-D — AERIAL STILL 4/5
Aerial still of the Inner Peace site, winter 2025–26 — view 5 of 5
FIG 11-E — AERIAL STILL 5/5
SHT 12 — MANOR
Manor Texas Last capture: Oct 2025 3 plates SHT 12 / 15
SHT 12 / PHOTOGRAPHIC RECORD

Manor

October 2025 photographic record of the Manor site — J&R's steel scope documented in three site plates. PROVISIONAL

P.1 — CAPTURED OCT 2025 · 3 PLATES P.1

STATION LINE — SITE VISITS ON FILE

Site record of the Manor project, October 2025
FIG 12-A — SITE PLATE 1/3 · OCT 2025
Site record of the Manor project, October 2025 — view 2 of 3
FIG 12-B — SITE PLATE 2/3
Site record of the Manor project, October 2025 — view 3 of 3
FIG 12-C — SITE PLATE 3/3
SHT 13 — WARD & BURKE — HEADWATER
Ward & Burke — Headwater Texas Captures: Jul · Aug · Sep 2025 7 flyovers · 1 plate SHT 13 / 15
SHT 13 / THREE-CHECKPOINT RECORD · BEST PROGRESS STORY

Ward & Burke — Headwater

The most complete progress record in the set: three aerial checkpoints across three months. From the July baseline through August erection to the September record, seven flyovers track the Headwater structure taking shape. PROVISIONAL

STATION LINE — SELECT A BENCHMARK TO VIEW THAT SITE VISIT

FIG 13-A — AERIAL PLATE · P.0 BASELINE · JUL 2025
SHT 14 — GENERAL NOTES
SHT 14 / GENERAL NOTES — CAPABILITIES & SAFETY

What we erect

Three service pillars, one crew standard. With over 20 years in the field, J&R delivers the full structural package — bid to topping out — for general contractors across Texas.

S-1  Structural Steel Erection

  1. 1.01Beams, columns, joists, girders, angles and braces — erected plumb, true, and on schedule.
  2. 1.02Field welding and bolted connections by experienced hands.
  3. 1.03Miscellaneous details — stairs, rails, embeds, and closure pieces carried through to punch-out.

S-2  Tilt-Wall & Precast Panels

  1. 2.01Erection and installation of tilt-up and precast wall panels for projects of any footprint.
  2. 2.02Multi-story panel work — engineered rigging and bracing on every pick.
  3. 2.03Safety and efficiency held together: panels set clean without slowing the schedule.

S-3  Metal Decking

  1. 3.01Loading, laying, and installation of metal deck with competitive efficiency.
  2. 3.02Safe, quick installations that keep the project's momentum.

GN  Safety — General Notes

  1. 0.01Daily safety meetings before work begins — every site, every morning.
  2. 0.02Harnesses, helmets, and welding gear — non-negotiable on every site.
  3. 0.03Rigging inspected and load paths verified before every pick.
  4. 0.04Efficient work ethic — never at the cost of the crew coming home.
SHT 15 — CONTACT
SHT 15 / TITLE BLOCK — ISSUED FOR CLIENT REVIEW

Put us on your next set

Send plans, ask for references, or walk a site with us. We bid promptly and erect on schedule.

Firm J & R Steel Welding LLC 5530 W Ridgecreek Dr #400 · Houston, TX 77053
J & R STEEL WELDING · HOUSTON · TEXAS · EST. 20+ YRS · STEEL ERECTION
Phone (832) 265-0882
Email Rmalvaez@jr-steel.com
Service area Texas — statewide
Experience 20+ years
Approved by
Client / General Contractor
Revisions
RevDescriptionDate
AIssued for client review2026-07
B——